BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.36.3//EN
X-ORIGINAL-URL:https://texascecon.org/
X-WR-CALNAME:CECON 2026
X-WR-CALDESC:Revitalizing Resiliency
X-WR-TIMEZONE:America/Chicago
BEGIN:VTIMEZONE
TZID:America/Chicago
X-LIC-LOCATION:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-4bb948d5b21472509627f7f4c2a44784@texascecon.org
DTSTART;TZID=America/Chicago:20260917T143000
DTEND;TZID=America/Chicago:20260917T153000
DTSTAMP:20260903T153823Z
CREATED:20260903
LAST-MODIFIED:20260904
PRIORITY:5
SEQUENCE:2
TRANSP:OPAQUE
SUMMARY:Gladys Porter Zoo Water &amp; Wastewater Improvements Project: Design, Construction, and Infrastructure Renewal within an Active Zoological Facility
DESCRIPTION:This presentation provides an overview of the design and construction of the Gladys Porter Zoo Water and Wastewater Improvement Project in Brownsville, Texas. The aging condition of the existing utility infrastructure, coupled with projected growth identified in the Zoo Master Plan, highlighted the need for comprehensive water and wastewater system upgrades to support future expansion and maintain reliable service.\nThe project included the rehabilitation and replacement of gravity sanitary sewer lines, manholes, lift stations, and water distribution infrastructure throughout the zoo. Improvements were designed to address deteriorating infrastructure, enhance system reliability, and increase capacity to accommodate future development. Given the unique operating environment of an active zoological facility, careful coordination was required throughout the design and construction phases to minimize disruptions to zoo operations, animal habitats, and visitor experiences.\nDesign efforts were completed in 2024, and construction was completed in 2026. This presentation will discuss key design considerations, construction challenges, stakeholder coordination, and lessons learned throughout the life of the project. The completed improvements have enhanced the resiliency and functionality of the zoo’s utility infrastructure\n
URL:https://texascecon.org/cecon/gladys-porter-zoo-water-wastewater-improvements-project-design-construction-and-infrastructure-renewal-within-an-active-zoological-facility/
CATEGORIES:Construction Institute (TxCI),Sessions
LOCATION:C105
END:VEVENT
END:VCALENDAR
